International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : SG01 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R SG01  C 

ITU-R SG01

Spectrum Management

Results:165 total items.
Result page:  Previous -  1 - 2 - 3 - 4  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 65 ]  
 
Final List of Participants - Study Group 1 (E-meeting, 3 June 2021)     Director, BR     2021-06-03
[ 64 ]  
 
List of documents issued (Documents 1/42 - 1/64)     BR, Study Groups Department     2021-06-03
[ 63 ]  
(Rev.1) 
Revision of Report ITU-R SM.2351-2 - Smart grid utility management systems     WP 1A     2021-06-02
[ 62 ]  
(Rev.1) 
Revision of Report ITU-R SM.2303-2 - Wireless power transmission using technologies other than radio frequency beam     WP 1A   Q210/1   2021-06-02
[ 61 ]  
(Rev.3) 
Executive Report on the May-June 2021 meeting of Working Party 1A (e-Meeting, 25 May - 2 June 2021)     Chairman, WP 1A     2021-06-02
[ 60 ]  
(Rev.1) 
Revision of Report ITU-R SM.2392-0 - Applications of wireless power transmission via radio frequency beam     WP 1A     2021-06-02
[ 59 ]  
 
Liaison statement on work related to environment energy efficiency and the circular economy and new areas of study     ITU-T SG5     2021-06-02
[ 58 ]  
 
Executive Report on Working Party 1B meeting (Online meeting, 25 May - 2 June 2021)     Acting Chairman, WP 1B     2021-06-02
[ 57 ]  
(Rev.1) 
Draft new Recommendation ITU-R SM.[MOB DF PERF] - Performance evaluation of Mobile DF units in operational environment     WP 1C     2021-06-02
[ 56 ]  
 
Executive Report to Study Group 1     Chairman, WP 1C     2021-06-02
[ 55 ]  
 
Draft revision of Recommendation ITU-R SM.575-2 - Protection of fixed monitoring stations against interference from nearby or strong transmitters     WP 1C     2021-06-02
[ 54 ]  
 
Proposed new Chairman and Vice-Chairman of Working Party 1B     Chairman, SG 1     2021-06-01
[ 53 ]  
(Rev.1) 
Draft new Recommendation ITU-R SM.[TDOA-ACC] - Test procedure for determining the accuracy of TDOA systems     WP 1C     2021-06-01
[ 52 ]  
(Rev.1) 
New Report ITU-R SM.2486-0 - Use of commercial drones for ITU-R spectrum monitoring tasks     WP 1C     2021-05-31
[ 51 ]  
(Rev.1) 
Revision to Report ITU-R SM.2093-3     WP 1B     2021-05-31
[ 50 ]  
(Rev.1) 
Revision of Report ITU-R SM.2153-7 - Technical and operating parameters and spectrum use for short range radiocommunication devices     WP 1B     2021-05-31
[ 49 ]  
(Rev.1) 
Draft new Question ITU-R [GPR/WPR]/1 - Spectrum management framework for the introduction of Ground- and Wall- Penetrating Radar (GPR/WPR) imaging systems     WP 1B     2021-05-31
[ 48 ]  
 
Report on CISPR activities from November 2020 to May 2021     Rapp. SG 1 (RG) on Liaison with CISPR , Rapp. to CISPR on WPT issues     2021-05-24
[ 47 ]  
 
Liaison statement on the new version of the Home Network Transport (HNT) standards overview and work plan     ITU-T SG15     2021-05-07
[ 46 ]  
 
Liaison statement on the new version of the Access Network Transport (ANT) standards overview and work plan     ITU-T SG15     2021-05-06
[ 45 ]  
 
Liaison statement on the new version of the Access Network Transport (ANT) standards overview and work plan     ITU-T SG9     2021-05-06
[ 44 ]  
 
Liaison statement to CISPR (Subcommittees B and H) (copy for information to Study Group 1 and Working Parties 1A, 4A, 4B, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D) - Update to Standard frequency and time signal services protection requirements in the CISPR radio services database     WP 7A     2021-04-26
[ 43 ]  
(Rev.1) 
Liaison statement to CISPR and CISPR/H (copy for information to Study Group 1 and Working Parties 5A, 6A and 7D) - Liaison between ITU-R and CISPR on the protection of radio services in the 6-40 GHz frequency range     WP 1A     2020-12-15
[ 42 ]  
+Ann.1 
Summary Record of the meeting of Radiocommunication Study Group 1 (On-line meeting, 3 December 2020)     Chairman, SG 1     2020-12-04
[ 41 ]  
 
Final list of participants Study Group 1: E-meeting, 3 December 2020     Director, BR     2020-12-03
[ 40 ]  
 
List of Documents issued (Documents 1/1 - 1/40)     BR, Study Groups Department     2020-12-03
[ 39 ]  
 
Proposed organization of the work of the Study Group 1     Chairman, SG 1     2020-12-02
[ 38 ]  
 
Executive Report on the November-December 2020 meeting of Working Party 1A (e-Meeting, 24 November - 2 December 2020)     Chairman, WP 1A     2020-12-02
[ 37 ]  
(Rev.1) 
Executive Report on Working Party 1B (Online meeting, 24 November - 1 December 2020)     Acting Chairman, WP 1B     2020-12-02
[ 36 ]  
(Rev.1) 
Executive Report to Study Group 1     Chairman, WP 1C     2020-12-02
[ 35 ]  
(Rev.1) 
Draft new Recommendation ITU-R SM.[FS-ACC] - Test procedure for measuring monitoring system field strength measurement accuracy in the VHF/UHF frequency range     WP 1C     2020-12-02
[ 34 ]  
(Rev.1) 
Draft revision of Report ITU-R SM.2130-1 - Inspection of radio stations     WP 1C     2020-12-02
[ 33 ]  
(Rev.1) 
Draft revision of Recommendation ITU-R SM.1392-2 - Essential requirements for a spectrum monitoring system for developing countries     WP 1C     2020-11-30
[ 32 ]  
(Rev.1) 
Draft revision of Report ITU-R SM.2405-0 - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means of radio systems employing cognitive capabilities     WP 1B     2020-11-30
[ 31 ]  
 
Proposed Correspondence Group on the editorial review and maintenance of ITU-R Recommendations and Reports assigned to Study Group 1     Chairman, SG 1     2020-11-24
[ 30 ]  
 
Studies under Resolution 731 (Rev.WRC-19) - Consideration of sharing and adjacent-band compatibility between passive and active services above 71 GHz     Chairmen, SGs 1, 5 & 7     2020-11-20
[ 29 ]  
+Corr.1 
Report on CISPR activities from June 2019 to November 2020     Rapp. SG 1 (RG) on Liaison with CISPR , Rapp. to CISPR on WPT issues     2020-11-19
[ 28 ]  
 
Liaison statement from ITU-D Study Group 2 Questions 5/2 to ITU-T SG 2, ITU-T SG 5, ITU-T SG 11, ITU-T SG 12, ITU-T SG 15, ITU-T SG 16, ITU-T SG 20, ITU-R Study Group 1, Working Parties 1B, 1C, 4A, 4B, 4C, 5A, 5D, Study Group 6, Working Party 6A, Study Group 7 on the final Report of ITU-D Q5/2 and draft future work of ITU-D Q5/2 to WTDC-21     ITU-D SG2     2020-10-27
[ 27 ]  
 
Reply liaison statement to CISPR and CISPR/H on the protection requirements for the broadcasting service (copy to ITU-R Study Group 1 and Working Party 1A)     WP 6A     2020-10-16
[ 26 ]  
 
Liaison statement from ITU-D Study Group 1 Question 6/1 on comments and information on the draft final Report - ITU-D Study Group 1 Question 6/1: Consumer information, protection and rights: Laws, regulation, economic bases, consumer networks     ITU-D SG1     2020-10-08
[ 25 ]  
 
Liaison statement to CISPR and CISPR/H (copy to ITU-R Study Group 1 and Working Parties 1A and 6A) - Additional information about the impact of WPT-EV on LF and MF broadcasting     SG 1 RG on Liaison with CISPR     2020-10-01
[ 24 ]  
 
Liaison statement from ITU-D Question 2/1 to ITU-R Study Group 1, specially Working Party 1B, ITU-T Study Groups 9 and 16, and EBU on comments and information on the draft final Report - Strategies, policies, regulations and methods of migration and adoption of digital broadcasting and implementation of new services     ITU-D SG1     2020-09-30
[ 23 ]  
 
Liaison statement on the new version of the Access Network Transport (ANT) standard overview and work plan     ITU-T SG15     2020-09-22
[ 22 ]  
 
Liaison statement on the new version of the Home Network Transport (HNT) standards overview and work plan     ITU-T SG15     2020-09-22
[ 21 ]  
 
Information on the preparation of texts for the draft CPM Report to WRC-23     Chairman, CPM-23     2020-09-18
[ 20 ]  
 
Liaison statement to Radiocommunication Study Groups and Working Parties (copy for information to ITU-T and ITU-D Study Groups)     Chairman, CCV     2020-07-14
[ 19 ]  
 
Outcome of the sixteenth meeting of the Chairmen and Vice-Chairmen of the Radiocommunication Study Groups, Working Parties and other subordinate groups     Director, BR     2020-06-25
[ 18 ]  
 
Proposal for the revision of relevant existing questions dealing with electromagnetic compatibility and unintentional electromagnetic emissions     Italy     2020-06-19
[ 17 ]  
 
Reply liaison statement on the new version of the Access Network Transport (ANT) standard overview and work plan     ITU-T SG9     2020-05-27
[ 16 ]  
 
Liaison response from CISPR/H to Working Party 6A on their proposal for changes in the radioservices database of IEC     International Special Committee on Radio Interference     2020-05-07
Results:165 total items.
Result page:  Previous -  1 - 2 - 3 - 4  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2023-10-19